2016年6月29日星期三

How to move diesel generator?


We first introduce the hoisting handling conditions at the time of delivery of the power generator.

1. Before lifting, should be removed oil and diesel in the power generator, water, gas line and connection cables, 
and each nozzle with plastic sheeting or other suitable material sealed tight tie.
2. Before lifting, should be used enough to withstand the weight of the rope diesel generator sets and spreader. 
Lifting hanging rope should be hung in the chassis at both ends, its length should be appropriate, 
even if the lifting equipment hook up on a plane 1m above the exhaust manifold to keep the rope parts not in direct contact with the unit.
3. When handling, special attention should be good protection diesel generator set control panel, in case smashed instruments.