China diesel generator operation manuals

China diesel generator operation manuals:
ItemsSteps
Before start1.Please check the oil level, coolant level, fuel oil meets the requirements2.Check the engine oil, lubrication, cooling system piping and fittings between the oil leakage, water leakage; electrical wiring for Pope such leakage risks; grounding lines, electrical lines for loose connections; units and base connections whether the firm
3. When the ambient temperature is below 5 ℃, it should be added within a certain percentage of the radiator antifreeze (refer to the specific requirements of diesel random data)
4.crew first start up or disabled when starting again after a long time, first hand pressure pump to drain the fuel system of air
Start`1. co-insurance on the control box and press the start button, press the start button for 3-5 seconds, if the starter is unsuccessful, you should wait about 20 seconds before making attempts. If you repeatedly fail to start, stop start, remove the battery voltage or oil such as failure factors for starting again2.start oil pressure should be observed, if the oil pressure is low or no display, you should immediately stop check
Running1. after starting the unit, check the control box module parameters: oil pressure, water temperature, voltage, frequency, etc. are normal2. In general, the unit directly after starting speed reaches 1500r/min, with the requirements of the unit idle, idle time is generally 3-5 minutes idle time not too long, or it may burn generator related components
3.Check unit oil, water and gas leakage road, with or without oil spills, leaks and leakage phenomenon
4. attention throughout the unit connections and fastening, loose and rattling
5. observation unit, various protection and monitoring device is normal
6. When the speed reaches the rated speed, and the parameters of stable no-load operation, the closing power to the load
7. Check that the control panel parameters within the allowable range, the vibration of the unit checked again, with or without leakage and presence of three other failures
Normal Shut down1. You must stop before the trip, in general, after unloading the load operation unit to be cooled down after 3 to 5 minutes
Emergency Shut down1. generator abnormal operation occurs, you must immediately stop2. emergency stop, press the stop button or the fuel pump control lever quickly pushed down to the parking position
Maintenance1. general, the diesel fuel filter replacement time is every 400 hours; air filter replacement time is every 1000 hours; oil filter replacement time of the first 50 hours after the replacement interval of 250 hours2.oil replacement time for the first 50 hours, the normal replacement time for the oil every 250 hours.
1. Service warning.
2. When you open the control panel, you must take the necessary protective measures to prevent possible electric shock
3. not arbitrarily change the unit circuits combined controller parameters, the resulting loss of aggregate costs borne by the customer service
4.Use China full power accessories and wearing parts recommended, due to the use of spare parts not recommended any loss resulting, China will not assume full power
5.When the ambient temperature is below 5 ℃ need to add antifreeze to use, or after the shutdown sequence drained radiator, the body and pump the residual cooling water storage
other matters, please read the instructions